▸ 验证状态 · 分阶段主网 SOAK

v2.0 soak 当前进度。

ReserveGrid OS v2.0 Invariant Shield 处于分阶段验证中。本页跟踪正在进行的浸泡测试、已经通过的部分,以及仍需真实 bitcoind 运行或矿池侧设计合作伙伴才能推进的部分。每落地一个检查点,数字随之更新。

截至 · 2026-05-05

Setup A · Shadow soak

○ 待处理

在验证器栈的 docker-compose 镜像上运行合成 mempool 数据流。原定的通过标准是整个窗口内 Class M 容差突破次数为零。2026-07-22 的取证发现 Invariant Shield 跳过了每一个 template,因此该标准从未执行:本窗口对 v2_invariant_mempool_tolerance_exceeded 在任何方向上都不构成证据。

2026-05-02
T+0 declared, baseline captured
● pass
2026-05-27
25-day window completed; pipeline and Phase 1 policy exercised
● pass
2026-07-22
Forensics: the Invariant Shield skipped every template, so the zero-breach result is withdrawn
○ gated
Class M 检查次数
已拒绝
下一个 checkpoint
Blocked on PB-19 · raw_block_hex on the wire
收尾
WITHDRAWN 2026-07-22 · criterion never exercised

Setup B · Real-bitcoind soak

○ 待处理

Class S and Class D check chain against a real mainnet bitcoind under live template flow. A hardened re-soak is running: T+0 2026-07-22, T+7 wrap 2026-07-29, with evidence written outside the soaked process so it survives container death. It exercises mempool-view infrastructure and Phase 1 policy only. The Class M criterion stays unexercised until the template sender ships raw_block_hex, so no Class M evidence exists yet.

阻塞于
PB-19 (raw_block_hex on the wire), then a fresh soak asserting shield_skipped == 0 at T+0.

Setup C · Pool-side design partner soak

○ 待处理

Live template stream from a participating Stratum V2 pool, mirrored into the verifier in shadow mode. Treats the pool as the source of truth and the verifier as a second pair of eyes; the only path to evidence on real-world template traffic.

阻塞于
Design partner. Pool operator interest required.

Phase 1.5 · Tier 3 invariant wiring

○ 待处理

Wired 2026-07-22. All seven Tier 3 invariants (coinbase_script_length, coinbase_output_count, weight_exceeds_max, sigops_exceed_max, nontcb_null_prevout, header_version_low, duplicate_tx) are implemented and tested behind the shield facade, bringing the Invariant Shield to 18 of 18 ADR-002 invariants running. Wired is not validated and not yet merged: the change sits on branch, and the merge to main is sequenced after the in-flight re-soak wraps.

阻塞于
Re-soak wrap 2026-07-29, then merge to main.
▸ DESIGN PARTNER 项目

Setup B 和 Setup C 开放中。

如果您运营 Stratum V2 矿池,并希望为您的 template 流增加第二双眼睛,Setup B 与 Setup C 的设计合作伙伴名额已开放。先从 shadow 模式开始,不在链路上启用强制执行,完整的证据轨迹留在您自己的可观测性栈中。本项工作的产出是一份公开的 soak 报告,运营方保留在自身基础设施中运行的一切。

下一步
联系团队 →

在消息中提到“design partner”,我们中会有人在两个工作日内回复。

▸ 资料来源
Release notes · v2.0.0-rc1 →架构走查 →Failure Atlas →代码仓库 →